Copying a date field from a child record to a parent

  • 1.  Copying a date field from a child record to a parent

    Posted 14 days ago
    So I have a need to copy a date record up from a child record to a parent record. I can't seem to find a good way to do this easily... I considered an automation, but it seems like those are a little slower to fire. Is there another solution I'm not considering?

    ------------------------------
    Thanks,
    Chris Newsome
    ------------------------------


  • 2.  RE: Copying a date field from a child record to a parent

    Posted 14 days ago
    I don't suppose you ca just use a summary field and maybe an override field on the parent. Then it would instantly recalculate on save.

    ------------------------------
    Mark Shnier (YQC)
    Quick Base Solution Provider
    Your Quick Base Coach
    http://QuickBaseCoach.com
    mark.shnier@gmail.com
    ------------------------------



  • 3.  RE: Copying a date field from a child record to a parent

    Posted 14 days ago
    Not sure I've ever seen that. How would I use a summary field on a date?

    ------------------------------
    Thanks,
    Chris Newsome
    ------------------------------



  • 4.  RE: Copying a date field from a child record to a parent

    Posted 14 days ago
    Something like this.
    When the dates changes and it should be a timestamp type date you could create an extra date field to stamp the date in the child table and freeze it with the snapshot function

    ------------------------------
    Jan-Willem S
    ------------------------------



  • 5.  RE: Copying a date field from a child record to a parent

    Posted 13 days ago
    I'm going to be honest and say I didn't understand any of that. Never even heard of a "snapshot" function.

    Let me explain a bit more of what I'm trying to accomplish. I have a parent record called "Opportunities." This is representative of a sale for us. We manufacture and install these jobs, so I am trying to create a linked system where I can simultaneously create a calendar entry for the shop to manufacture, and the scheduled date of install. It would be related like this:

    Install date (ex: 3/1/2020)
    Shop production date (2/28/2020)

    If for some reason the install date were to change, I'd want the shop date to change automatically in relation to that, which I imagined would be a simple formula. Relationships are like this:

    Opportunities < Installations
    Opportunities <Productions

    My thought was to have a date field under opportunities that could filter down to all child records. I called this field "Scheduled Start date." The issue I'm running into is that although I can share this field with the child records, I want the "installation" record to be able to control this date. I'll then create a formula date field under "productions" that's based on the "scheduled start date" minus a certain # of days. 

    Ideally, I'd create a "trip date" field under installations, and have "opportunities/scheduled start date" match that automatically. Then, when I changed the trip date, "scheduled start date" would change as well, and my other formula date fields would recalculate based on that field. Perhaps there's a better way to achieve this, but this was what I came up with as I'm planning it out.​

    ------------------------------
    Thanks,
    Chris Newsome
    ------------------------------