I am looking to create a duration between two dates but before the second date.

  • 1.  I am looking to create a duration between two dates but before the second date.

    Posted 02-07-2019 20:43
    I am looking to create a duration between two dates but before the second date. Example: Accident occurred day 1-12-19 and observation date is 12-28-18. I want to know how many dates was the most resent observation date is from the accident date.


  • 2.  RE: I am looking to create a duration between two dates but before the second date.

    Posted 02-07-2019 21:16
    Try this as a formula numeric field

    ToDays([Accident Date] - [Observation Date ])