ContributionsMost RecentMost LikesSolutionsRe: calculate duration between 2 dates I am trying to get a duration as well and for some reason this is not working. ToDays([Date Responded]-[Form Recorded Date]) It says expecting duration but found number? Both fields are date fields. I am thoroughly confused. Top 3 of the top 3?I am trying to create a report that will show me the top 3 categaries (based on submission numbers) and what the top 3 sub catagories are in each catagory in that top 3. I need it to be based on the last 7 days of reports submitted. I am completely not equiped to figure this out. Thanks!