ContributionsMost RecentMost LikesSolutionsRe: Calculate the number of days between Today and Date ModifiedWorked like a charm!!! Thank you kindly.Re: Calculate the number of days between Today and Date ModifiedHere is what I get: The expressionToday()on the left hand side of the operator "-" is of typedatewhile the expression[Date Modified]on the right hand side is of typedate/time. The operator "-" cannot be used with these types of expressions.Calculate the number of days between Today and Date ModifiedI need a formula to calculate from todays date to the time a project was last modified. Any help would be appreciated!!Re: Email messaging not workingDigging into it further.....the Message form did not carry over the related notification. I added a new notification for messages and it is now working. Crying before I'm hurt I guess :-)Email messaging not workingI duplicated an app, made changes and renamed. Email notifications are working, but sending a message through a form is not. (Although it works in the original app) Any help would be appreciated.Re: I want to create a list of ""types of work"" and apply a percentage to eachPerfect!!!! If you would be so kind - now I want to pull a report (pie chart) that is broken down by the values I just created. Design, production etc. What I am trying to end up with is that with all of our projects - this percent was design, this percent production, etc.I want to create a list of ""types of work"" and apply a percentage to eachI want to create a list of "types of work" in a form and apply a percentage to each...reaching a total of 100%. For example: If a project requires design (20%), production(70%) photography(10%) I want to manually apply a percentage to each which must total 100%.Re: How can I calculate the duration of a project to display in a table? I have a field ""Date Created"".Another question if I may. In a message from quickbase, I want to put a link to the original message in the email. I know that the link is created using: %recLink% However, is it possible to put this in a href tag? <a href="%recLink%">REPLY to this message</a> It is not displaying properly in my testRe: How can I calculate the duration of a project to display in a table? I have a field ""Date Created"".Worked Perfectly!!! Thank you so much!!Re: How can I calculate the duration of a project to display in a table? I have a field ""Date Created"".Not only do I need to see from "Date Created" to "Date Completed", but would also like to see "Date Created" to Todays Date if not completed.