Automate % complete
Hi thereIs there a way of updating % complete automatically in a form, based on the status (not started, in progress, complete) of tasks ...
  • 1 me too
  • 4 replies
  • Question
  • Answered
Photo of Treena
Big red text or image in form
Hi there I want to be able to write a project name in big red text onto a form so that, when a person is flicking between several QB app...
  • 1 me too
  • 3 replies
  • Question
  • Answered
Photo of Treena
How to design app for needs
Hi there I am having real trouble designing an app I need and wonder if you have any suggestions. I need to present people with a lot o...
  • 1 me too
  • 2 replies
  • Question
  • Answered
Photo of Treena
Calculation based on rules
Hi there I want to be able to add numeric fields together if certain rules apply: If the currency is equal to GBP, I want to add fields...
  • 1 me too
  • 2 replies
  • Question
  • Answered
Photo of Treena
Total of numeric formula fields
I have a whole bunch of numeric fields and numeric formula fields calculating various different things. I want to be able to add all thos...
  • 1 me too
  • 1 reply
  • Question
  • Answered
Photo of Treena
Numeric Summaries
Hi there I have a master table with a field that contains numbers. I have a target I need to reach. I want to compare the target with the...
  • 1 me too
  • 7 replies
  • Question
  • Answered
Photo of Treena
limit number of bookings for a date
Hi there I have a list of training dates. I want to limit bookings for each date. Eg, I want only 10 people on each slot. Is there a way...