Hi,
I am recording time stamps using automation in the child table whenever there is a status update in the parent table and I need to calculate the time difference between 2 time stamps say start and stop. I was able to do it when there are only 2 time stamp but the problem is when I have more than 1 start and 1 stop.
I need the difference between the 1st start and stop and similarly for the consecutive start and stops. There might be 20 such start and stop before a project is completed and I need the sum of the difference between each start and stop.
Any help is appreciated.
Thanks in advance.
------------------------------
Srinath MR
------------------------------