Question
How to calculate run time from hour meter reading
I own a small utility company and have several operators check in plants. They record the day's meter readings (cumulative hour meters and water meters) in QuickBase. I need to calculate run time based on the previous reading compared to the current reading. I have dozens of facilities, hundreds of meters to read and thousands of reads. Tables: Facilities, Equipment, Reads. The readings are taken on random dates (no defined interval). I have the read table related to itself so that the previous read can be "selected". This has been working but I would like to be able to import a list of reads but I don't know how to populate the record ID required for finding the "previous" read. I think I'm looking for a way to dynamically/logically calculate the key field.
This topic has been closed for replies.
Sign up
Already have an account? Login
Login to the community
Login with Quickbase US – quickbase.com Login with Quickbase EU – quickbase.eu
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.