Hi. New to QuickBase but couldn't find the answer to this.
I have a table that lists bids that have been received. We have events called BDM Camp and I need to find a way to calculate when a BDM Camp is held, the ratio or percent of the bids that are Awarded, Lost or Cancelled. (I need to divide the number awarded or lost or cancelled into the total amount of bids that had BDM Camp)
The bids are represented by a specific code for that Bid. The event is called BDM Camp and then results are a field called BDM Award Outcome (answers can be Awarded, Lost, Cancelled). I tried writing formulas, but I keep getting the notification that I am using "/" incorrect or Average incorrect.
Any help is appreciated.
Sign up
Already have an account? Login
Login to the community
Login with Quickbase US – quickbase.com Login with Quickbase EU – quickbase.eu
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.