I am trying to automate the calculation of time required to create training, based on industry averages.
For example, it should take approximately 49 hours to write/design 1 hour of basic (Level 1) learning (49:1). The problem is training isn't always a nice, clean 60 minutes, which brings me to this forum.
I have two inputs and one results field:
input: Level of Training (Level 1, 2, 3 or Instructor Lead)
input: Length of Training (in 15 minute increments)
:result: Estimated Design Time
The Level of Training determines my ratios: Level 1 49:1. Level 2 79:1, etc. The problem that I run into is when I enter a Length other than a whole number (.25, 1.5 etc) and try to calculate, it creates results that are less than favorable (not unlike my last relationship).
I've spent quite a few hours trying to research ratios (and how to calculate them) since I wanted to solve this on my own, but cannot seem to find a solution via that route (as you may have noticed, math is not my sweet spot).
Any help would be greatly appreciated!
Question
How would I calculate a ratio based on specific criteria?
This topic has been closed for replies.
Sign up
Already have an account? Login
Login to the community
Login with Quickbase US – quickbase.com Login with Quickbase EU – quickbase.eu
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.