ContributionsMost RecentMost LikesSolutions500 element limit on form It appears that there is a limit of 500 elements on a form. Is there a way to see a list of all elements on a form like there was on the legacy form? If not, is there a way to get a tally of elements on any given form? Re: Embedded Grid Edit Report Pre-filtered Conditional Dropdown Had to refresh cache or cookies (using Chrome) and it finally showed up correctly. Re: Embedded Grid Edit Report Pre-filtered Conditional Dropdown Does this marked solution still work? I have done exactly as you describe in the solution but in grid edit I still see the default picker columns Re: Is there a limit to number of filters on a dashboard Thanks Is there a limit to number of filters on a dashboard I have a map report on a dashboard that sits in table with 18K of records. Is there a limit to the number of unique filters that I can use to sort this map report on the dashboard? SolvedRe: 1st Google Calendar Integration - how to update / delete Do you know anyone who has experience with the channel? Is there a QB technical resource that I could contact? Re: 1st Google Calendar Integration - how to update / delete Hi Mark, Have you since tried updating a Google Calendar event by Fetching a Linked On New Event (Linked Advanced) which is set in the Add event pipeline? This has worked for me without having to "write back" the Event ID. Maybe you can help with the reverse, i.e. updating the "linked" QuickBase record when the Google Calendar event is updated. I have tried Fetching a QuickBase record by choosing the resource Event Updated from the Google Calendar event step, but I am not getting any activity for the pipeline when the Google Calendar event is updated. Interestingly, even though I show no pipeline activity, I am showing that the pipeline was triggered by the Google Calendar event update. Adding a Google Calendar Event I have a pipeline that successfully adds or updates a Google calendar event when the event is added or changed in a QuickBase table. Does anyone know what format Google Calendar is looking for in the Time Zone field (see attached) Pipeline Error Does anyone have any idea why I am getting this error when trying to update a record in a table from another record in another table? Validation error: Invalid date/time value: 0.0 I don't have any date/time values that are being updated. They are all date values being updated by date value fields. Passing images to gmail from QB gmail pipeline channel. I have a QB rich text field which I am placing in the gmail pipeline channel body field. All of the rich text is appearing in gmail sends except for the images. The gmail is not recognizing the image even if the image URL is on a public domain. Any ideas how to get an image to appear in gmail via this channel?