I have two dates fields side by side in a form. Site Plan Requested and Site Plan Returned. I have a field beside these called "Days to Complete" that calculates the duration. Right now the field is using a simple operator (-) to handle the duration calc, but it includes weekends. So when I add a date in both fields with the weekdaysub formula, the Days to Complete field is blank.