Forum Discussion
JessicaFeauto2
9 years agoQrew Cadet
Currently through an Excel import weekly. Soon through a connection with SF.
Regardless of the method, Line Items are added to a proposal simultaneously, but it does not matter which line item becomes "Line Item 1", "2" etc. as long as it does not change after it is assigned
Regardless of the method, Line Items are added to a proposal simultaneously, but it does not matter which line item becomes "Line Item 1", "2" etc. as long as it does not change after it is assigned