JimHarrison
9 months agoQrew Champion
How to manage a live Pipeline and make edits?
I cannot edit a Pipeline while it is running, when I do it stops. Users are unable to do work because the Pipeline is stopped. I cannot edit the Pipeline.
Do I make two Pipelines and keep them aligned by changing both the same?
Do I copy the Pipeline each time I make changes and then after making changes to the copy, stop the old Pipeline and then start the new Pipeline?
Do I wait until everyone has gone home and make changes after hours?
Do I export the yaml into another Pipeline, make changes to the temp Pipeline and then export - Import back into the old Pipeline?
Hmmmm
------------------------------
Jim Harrison
transparency = knowledge + understanding : The Scrum Dudes
------------------------------