Forum Discussion
TimLivermon
6 years agoQrew Member
Thank you for the quick response. I tried to paste an image of the report showing the report fields I need to add with the original question but it didn't show up. I'll try to paste again below. The material types have different costs so I can't use the total which is 1992 for the first job. That comes the the program that generates the imported file. The Total Cost formula would add the 3 Model Material Costs to to the Support Material Cost for the first Job and then go to the next Job.
Thanks again.
Thanks again.