KingslySamuel1
8 years agoQrew Assistant Captain
Average (Actual Duration) on Reports
Hi,
I have a "text-multiple choice" field with drop down options "revise, reuse, modify, new". I am pulling up a report grouped based on the above options. The report shows up only the "total" of the "Actual Duration" for each group. Is there a way, I can make the report to show "averages" instead of "total" on the "Actual Duration". See screen shot:
The report customization gives me only option to "hide all total/averages" (and, not to show "averages")
I would like to see the result of on an average how many days it takes to finish a "new or revised, or modify" project.
Please help. Thanks.
I have a "text-multiple choice" field with drop down options "revise, reuse, modify, new". I am pulling up a report grouped based on the above options. The report shows up only the "total" of the "Actual Duration" for each group. Is there a way, I can make the report to show "averages" instead of "total" on the "Actual Duration". See screen shot:
The report customization gives me only option to "hide all total/averages" (and, not to show "averages")
I would like to see the result of on an average how many days it takes to finish a "new or revised, or modify" project.
Please help. Thanks.