I did find the answer with QB Junkie. Here is the formula and it worked.
{{ a.expected_implementation_date.replace(day=1) + time.delta(months=3) }} with 3 being the variable for each month needed. This also makes the date the 1st of each of those months specified.
I was also able to do all 4 record creation steps within the same pipeline.