Reporting a number of days the status of a job was running between 2 custom dates.
I have fields for the following
Job ID
Status
Start
Stop
At any time, I can get a request to count and report on my job days. My definition of a job day is a job that is running on that day is 1.
However, if I need to run this report from the 8th of the previous month through the 8th of this month, I don't want the days the job was still running before or after this date to be counted in the total number of job days.
How would I get this to track accurately and be able to pull the report easily.
Job ID
Status
Start
Stop
At any time, I can get a request to count and report on my job days. My definition of a job day is a job that is running on that day is 1.
However, if I need to run this report from the 8th of the previous month through the 8th of this month, I don't want the days the job was still running before or after this date to be counted in the total number of job days.
How would I get this to track accurately and be able to pull the report easily.